Date Form Update: October 22, 2009

 

Project Name:    El Rio Forebay Groundwater Contaminant Elimination Project (GCEP)El Rio Sewer System Phases 5B, 5C, and 5D

 

Specification No. WW09-05  ;  

9

Project No.  28236

Contract Awarded to:

Contractor:

Specialty Construction, Inc.

2

Address

645 Clarion Ct.,,San Luis Obispo, CA,93401

4

5

6

Telephone No.

(805)543-1706

7

License No.:

619361

3

Contract Information:

Contracting Agency:

County of Ventura

Awarded on Date:

10/20/2009

Contract Amount:

$7,076,403.00

10

Probable Starting Date:

11/17/2009

11

Working Days Allowed:

400

Probable Completion Date:

7/8/2011

12

Bid Advertisement Date:

7/2/09

Agency Contact:

Project Manager

Cefe Munoz

P.M. Phone No.

(805)378-3020

Project Information:

Location:

North of US 101 between Vineyard Ave. and Rose Ave., including Alvarado St., Citrus St., Collins St., Corsicana Dr., Cortez St., Helsam Ave., Kenney St., Minna St., Orange Dr., Rio School Lane, Rose Ave., Salem Av., Stroube St., Vineyard Av., and Walnut Dr. , in El Rio, near Oxnard, Ca.

8

Description:

Installation of gravity sewer collection system and appurtenant work.

13

14

15

Labor Code

Section 7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws relating to labor.

16

 

Unusual Safety Exposure

Job involves trenching, depths 5-16 ft deep.  Job has unstable soil conditions, a Geotechnical Report prepared by Earth systems, Dated March 25, 2003 was provided.  An “Excavation Safety” bid item has been included.  There will be work around Storm drains, gas power lines and telephone cables, water and oil lines.

Traffic Restrictions

Project is on or may effect the following streets: Balboa to George Street including: Lemar Avenue, Will Avenue, Simon Way, Salem Avenue, Helsam Avenue and all of George Street.

Traffic signs shall be installed, traffic flow shall be maintained, and lanes may be closed per Traffic Control Plans requirements and Encroachment Permit. There may be interruptions to the normal flow of traffic:  Contractor shall submit work area plan and/or Traffic control Plan as required by Transportation Dept..

 

 

Project Name:    Pavement Rehabilitation 2008 On - System Roads

 

Specification No. RD09-03  ;  

9

Project No.  50434

Contract Awarded to:

Contractor:

Toro Enterprises, Inc.

2

Address

P O Box 6285,,Oxnard, CA,93031

4

5

6

Telephone No.

(805)483-4515

7

License No.:

710580

3

Contract Information:

Contracting Agency:

County of Ventura

Awarded on Date:

10/1/2009

Contract Amount:

$1,346,900.50

10

Probable Starting Date:

10/15/2009

11

Working Days Allowed:

42

Probable Completion Date:

1/12/1900

12

Bid Advertisement Date:

9/3/09 

Agency Contact:

Project Manager

Ariel Braza

P.M. Phone No.

(805)654-2058

Project Information:

Location:

Location of Project Santa Rosa Rd., Camino Dos Rios, Foothill Rd., Villanova Rd. and Doris Ave (See attached page 2 for location list)

8

Description:

Pavement Rehabilitation including roadway preparation, crack sealing, AC base repair, concrete curb and gutter, cold milling and grinding conventional AC overly, traffic control, construction signing, traffic counter station installation, traffic signal loop detector, pavement delineation and striping.

13

14

15

Labor Code

Section 7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws relating to labor.

16

 

Unusual Safety Exposure

N/A

Traffic Restrictions

Affect Roads: Santa Rosa Road, Camino Dos Rios, Foothill Road, Villanova Road and Doris Road. Traffic on the above roads may be restricted to one half of the roadway. Describe how traffic will be handled. Lane closures are allowed between 8:30 a.m. to 4:00 p.m. Contractor shall place flagmen in each direction directing traffic. On Santa Rosa Road, no lane closures allowed between 6:00 a.m. – 9:00 a.m. and 3:30 p.m. – 5:30 p.m. Contractor shall place a Changeable message sign (CMS) on Santa Rosa Road on the approach to the work in each direction at least days before traffic disruptions begin. Two CMS shall remain until paving is complete. Interruptions may occur due to one lane closure as stated above.

 

 

NAME OF ROAD

LIMITS

THOMAS GUIDE NO.

Santa Rosa Road

Yucca Drive to Glenside Lane (Near city of Camarillo)

495-J7,496-A7, 496-B7

Camino Dos Rios

Cul De Sac to 67' W/O Lynn Road (Near the City of Thousand Oaks

526-B6, 526-C6, 526-D6

Foothill Road

Aliso Canyon Road to Wheelr Canyon Road (Near the city of Ventura

473-B1, 473-B2, 473-B3, 473-B4

Villanova Road

SR 33 to 203 E/O County Drive and 203 E/O County Drive to SR 33 (Near the city of Ojai)

451-C3, 451-D3, 451-D2, 451-E2, 451-F2

Doris Avenue

Victoria Avenue to 77' W/O Patterson Road (Near the city of Oxnard)

522-B5, 522-C5, 522-D5

 

 

 

Project Name:    Sespe Creek Toe Repair 2009

 

Specification No. WP10-12  ;  

9

Project No.  83310

Contract Awarded to:

Contractor:

Belaire-West Landscape, Inc.

2

Address

P.O. Box 6270,,Buena Park, CA,90620

4

5

6

Telephone No.

(714)523-9200

7

License No.:

448636

3

Contract Information:

Contracting Agency:

Ventura County Watershed Protection District

Awarded on Date:

9/17/2009

Contract Amount:

$158,196.00

10

Probable Starting Date:

10/1/2009

11

Working Days Allowed:

30

Probable Completion Date:

11/13/2009

12

Bid Advertisement Date:

8/20/09

Agency Contact:

Project Manager

Kirk Norman

P.M. Phone No.

(805)654-2017

Project Information:

Location:

Levee is on the east side of Sespe Creek, between Old Telegraph Road and Goodenough Road, Fillmore

8

Description:

Construction of 1,900 linear feet of curb, gutter, v-ditch, and 2680 square yards of CMB access road, and appurtenant work. Purpose of project is part of the FEMA Levee certification program.

13

14

15

Labor Code

Section 7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws relating to labor.

16

 

Unusual Safety Exposure

Job has unstable soil conditions, Cuts into levee toe. An “Excavation Safety” bid item has been included, Excavation will be less than 5’ deep. There will be work around Power lines.

Traffic Restrictions

Project work will not affect traffic on any public way.

 

 

Project Name:    Sespe Creek Levee At Goodenough Rd 2009

 

Specification No. WP10-13(I)  ;  

9

Project No.  12007

Contract Awarded to:

Contractor:

Cal Fran Engineering, Inc.

2

Address

990 Enchanted Way, Ste 106,,Simi Valley, CA,93065

4

5

6

Telephone No.

(805)579-9173

7

License No.:

701492

3

Contract Information:

Contracting Agency:

Ventura County Watershed Protection District

Awarded on Date:

9/16/2009

Contract Amount:

$52,951.00

10

Probable Starting Date:

10/7/2009

11

Working Days Allowed:

15

Probable Completion Date:

10/28/2009

12

Bid Advertisement Date:

9/3/09

Agency Contact:

Project Manager

Larry Tanouye

P.M. Phone No.

(805)672-2105

Project Information:

Location:

Project is located approximately less than a mile west of Goodenough Rd. and less than a mile northwest of the intersection of Goodenough Rd. and Griffan Dr., City of Fillmore

8

Description:

Removal of all irrigation features, vegetation, trees, root balls, the filling of resulting voids with impervious material while firmly compacting and reshaping the toe to the 2:1 slope requirement. Purpose of project is to restore the toe to its original design intent thus guaranteeing compliance with current levee requirements. Its also provides erosion control and other necessary maintenance that will prevent future flood control issues.

13

14

15

Labor Code

Section 7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws relating to labor.

16

 

Unusual Safety Exposure

There will be work around power lines.

Traffic Restrictions

Project work will not affect traffic on any public way.

 

 

Project Name:    River Parkways Grant Giant Reed Removal 2009

 

Specification No. WP10-01  ;  

9

Project No.  81908

Contract Awarded to:

Contractor:

Natures Image, Inc.

2

Address

20472 Crescent Bay Drive, Suite 102,,Lake Forest, CA,92630

4

5

6

Telephone No.

(949)705-5800

7

License No.:

720513

3

Contract Information:

Contracting Agency:

Ventura County Watershed Protection District

Awarded on Date:

9/15/2009

Contract Amount:

$307,359.00

10

Probable Starting Date:

9/29/2009

11

Working Days Allowed:

545 Calendar

Probable Completion Date:

4/1/11

12

Bid Advertisement Date:

8/13/09

Agency Contact:

Project Manager

Karl Novak

P.M. Phone No.

(805)654-3706

Project Information:

Location:

Project is near Highway 150 along the Ventura River, in an unincorporated area of Ojai. Nearest cross streets are Highway 150 and S. Rice Road.

8

Description:

Remove and retreat giant reed (arundo donax) and other non-native vegetation within an approximate 175 acre site along the Ventura River. Purpose of project is to remove non-native (exotic) plants thus restoring the native ecosystem along the river in the interest of fire and flood prevention, utilizing California River Parkways Giant Programs funds.

13

14

15

Labor Code

Section 7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws relating to labor.

16

 

Unusual Safety Exposure

N/A

Traffic Restrictions

N/A

Project Name:    Well No. 20 and Treatment Works

 

Specification No. WW09-01  ;  

9

Project No.  31831

Contract Awarded to:

Contractor:

V. Lopez Jr. & Sons

2

Address

General Eng. Contractors, Inc.,P O Box 488,Santa Maria, CA,93456

4

5

6

Telephone No.

(805)928-1198

7

License No.:

607333

3

Contract Information:

Contracting Agency:

Ventura County Waterworks District No. 1

Awarded on Date:

8/11/2009

Contract Amount:

$1,814,555.00

10

Probable Starting Date:

September 8, 2009

11

Working Days Allowed:

200

Probable Completion Date:

July 6, 2010

12

Bid Advertisement Date:

6/4/09

Agency Contact:

Project Manager

Eric Keller

P.M. Phone No.

(805)378-3025

Project Information:

Location:

Championship Drive, ½ mile east of Grimes Canyon Road, in the city of Moorpark

8

Description:

Construction of well pump, automatic water filtration system, booster pumps, 32,000 gal reclaim tank & pump, CMU chemical and controls building, roll-away type steel frame well pump-house, electrical switchgear, instrumentation, yard piping, and grading. Project will provide local water form existing Well No.20 at 1000 gpm through an existing pipeline to the Palmer Reservoir 944 pressure zone.

13

14

15

Labor Code

Section 7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws relating to labor.

16

 

Unusual Safety Exposure

Job involves trenching to 8 feet deep.  An “Excavation Safety” bid item has been included to cover the above checked items. Job will probably require scaffolding above the ground floor. There will be work around power lines, telephone cables and Water lines.

Traffic Restrictions

Project work will not affect traffic on any public way.

 

 

Project Name:    Ventura County Waterworks District No. 1 Roseland Booster Pump Station

 

Specification No. WW09-06  ;  

9

Project No.  31886

Contract Awarded to:

Contractor:

Blois Construction, Inc.

2

Address

3201 Sturgis Rd.,,Oxnard, CA,93030

4

5

6

Telephone No.

(805)656-1432

7

License No.:

256065

3

Contract Information:

Contracting Agency:

Ventura County Waterworks District No. 1

Awarded on Date:

8/5/2009

Contract Amount:

$562,242.00

10

Probable Starting Date:

September 2, 2009

11

Working Days Allowed:

125

Probable Completion Date:

March 12, 2010

12

Bid Advertisement Date:

4/30/09

Agency Contact:

Project Manager

Eric Keller

P.M. Phone No.

(805)378-3025

Project Information:

Location:

Fairview Reservoir, 8875 Roseland Avenue, Moorpark 93021

8

Description:

Construction of a booster pump station at existing reservoir site, consisting of site work, pumps, piping, electrical, and instrumentation work including a stand by generator.  Construction of booster pump station to serve customers located at higher elevations with water pressure for domestic and firefighting purposes.

13

14

15

Labor Code

Section 7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws relating to labor.

16

 

Unusual Safety Exposure

Job involves trenching over 5’ deep. Give range of trench depths: 3 to 9-ft. An “Excavation Safety” bid item has been included. There will be work around Water and Power lines and telephone cables.

Traffic Restrictions

Project is on or may affect Roads, Streets and Highways. Those affected are: Roseland Avenue may be impacted for 1-week maximum during final pipeline connection & valves. Traffic on Roseland Ave. may be restricted to one half of the roadway.  Contractor will provide flagmen to facilitate traffic in both directions.

 

 

Project Name:    Pavement Rehabilitation-2009 On System Roads Phase A - Various Locations

 

Specification No. RD09-10  ;  

9

Project No.  50451

Contract Awarded to:

Contractor:

Granite Construction Company

2

Address

P.O. Box 50085,,Watsonville, CA,95077

4

5

6

Telephone No.

(831)724-1011

7

License No.:

89

3

Contract Information:

Contracting Agency:

County of Ventura

Awarded on Date:

7/10/2009

Contract Amount:

$2,131,545.00

10

Probable Starting Date:

August 7, 2009

11

Working Days Allowed:

50

Probable Completion Date:

October 20, 2009

12

Bid Advertisement Date:

5/28/09

Agency Contact:

Project Manager

Ariel Braza

P.M. Phone No.

(805)654-2058

Project Information:

Location:

Location of project is on Mission Drive, Beardsley Road, Corsicana Drive, Simon Way, West Potrero Road, Center School Road, Tico Road, Spring Road. Near the city of Oxnard, Camarillo, Thousand Oaks, and Ojai, see page 2 attached for more complete description.

8

Description:

Pavement rehabilitation including roadway preparation, surface preparation and crack sealing, asphalt rubber hot mix and conventional AC overlay, and shoulder backing.  It also includes traffic control and construction signing, traffic counter station installation, traffic signal loop detector replacement and pavement delineation and striping.

 

 

13

14

15

Labor Code

Section 7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws relating to labor.

16

 

Unusual Safety Exposure

N/A

Traffic Restrictions

Traffic on roads in the location list may be restricted to one half of the roadway.  One lane will be opened at all times with flagmen posted in each direction directing traffic.

 


 

Page 2 of 2

Project Name:  Pavement Rehabilitation – 2009 ON SYSTEM ROADS

Phase A – Various Locations

 

Specification No.:  RD09-10 Project No.:  50451

Federal Project No.: ESPL-5952 (139)

Locations:

  1. Thomas Guide No. and Supervisorial District:

Supervisor District No. 3:

1)       Mission Dr                     – 494D6, 494D7

Limits:  Mission Dr 140s Catalina Dr – N Loop Dr

      (Chatsworth Peak; near City of Camarillo)

2)       Beardsley Rd     – 493G7, 523F1

Limits:  Beardsley Rd                       - Central Av – 413n Wright Rd

      (Del Norte Area; near City of Camarillo)

3)       West Potrero Rd            – 554C4, 554D4, 554E4, 554F4, 554G4,

                                          554H4, 554J4, 555A4

Limits:  West Potrero Rd      - Hueneme Rd – 1.8mi east

1.8mi e Hueneme Rd – MP 3.5

MP 3.5 – 727w Via Acosta

(Hidden Valley; near City of Thousand Oaks)

4)       Center School Rd    – 494C4, 494C5

Limits: Center School Rd     - 436e Callado St – SR 118

 (Las Posas Valley; near City of Camarillo

 

 

Supervisor District No. 5:

5)       Corsicana Dr     – 492J7, 523A1

Limits:  Corsicana Dr                        - CDS – Rose Av

      (El Rio; near City of Oxnard)

6)       Simon Way                   – 492J7, 493A7

Limits:  Simon Way             - Vineyard Av SR232 – Rose Av

      (El Rio; near City of Oxnard)

 

Supervisor District No. 1:

7)       Tico Rd                         – 441D7, 451D1, 451D2

Limits: Tico Road                - SR 150 – Lomita Av

 (Mira Monte; near City of Ojai)

8)       Spring Road                  – 451B7, 461B1

                        Limits:  Spring Road                   - 840s Grande V – Grande Vista St. Grande Vista St – Larmier Av

                      (Oak View; near City of Ojai)

 

 

Project Name:    Tapo Canyon L.A Ave to Cochran St Repair 2009

                         Specification No. WP09-16(M)  [9];Project No.  47422

Contract Awarded to:

Contractor:

Aguilera Bros. Construction, Inc.

[2]

Address

288 Country View Ct.,,Santa Paula, CA,93060

[4-6]

Telephone No.

(805)933-3067

[7]

License No.:

873775

[3]

Contract Information:

Contracting Agency:

Ventura County Watershed Protection District

Awarded on Date:

6/23/2009

 

Contract Amount:

$633901.00

[10

Probable Starting Date:

TBD, Permit Issue

[11]

Working Days Allowed:

30 (REVISED)

 

Probable Completion Date:

TBD

[12]

Bid Advertisement Date:

6/23/09

 

Agency Contact:

Project Manager

Karl Novak

P.M. Phone No.

(805)672-2106

Project Information:

Location:

The project is located on the Northeast and Southwest bank of Tapo Canyon Channel from Los Angeles Avenue to Cochran Street in the City of Simi Valley. Access to the project is from Cochran St., Copley St., and Los Angeles Ave.

[8]

Description:

The project consists of repairing damage at 34 sites along a 3400’ reach of the trapezoidal channel.  Repairs include replacing 3325’ of concrete invert, excavating and replacing sections of both the east and west banks, and epoxy crack repair. Project purpose is to repair the invert and east and west banks of an existing trapezoidal RC channel that has been in service for over 45 years and has been damaged by winter storms.

[13]

[14] [15]

Labor Code

Section 7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws relating to labor.

[16]

Unusual Safety Exposure

N/A

Traffic Restrictions

N/A

 

 

Project Name: Arundell Barranca Telegraph Rd. to Loma Vista Rd. Channel Repair 2009

                         Specification No. WP09-10(M)  [9];Project No.  42405

Contract Awarded to:

Contractor:

Coastal Grading & Excavating, Inc.

[2]

Address

P O Box 2459,,Moorpark, CA,93021

[4-6]

Telephone No.

(805)523-7995

[7]

License No.:

853340

[3]

Contract Information:

Contracting Agency:

Ventura County Watershed Protection District

Awarded on Date:

6/23/2009

 

Contract Amount:

$183507.00

[10

Probable Starting Date:

TBD, Permit Issue

[11]

Working Days Allowed:

30

 

Probable Completion Date:

TBD

[12]

Bid Advertisement Date:

6/23/09

 

Agency Contact:

Project Manager

Karl Novak

P.M. Phone No.

(805)672-2106

Project Information:

Location:

This project is located in the City of Ventura within the County of Ventura. The job site is situated 0.75 miles NNW of Hwy 126 and Victoria and 500’ west of Wake Forest and Loma Vista. Access to the area is from the southern side of Loma Vista where it crosses the Arundell Barranca.

[8]

Description:

The project consists of repair of damaged sections of existing slope protection, backfilling eroded channel bank sections, and repairing damaged concrete invert and stabilizer locations. Project purpose is erosion control measures to restore the barranca to its original design intent, providing much needed maintenance and prevention of future flood control issues.

[13]

[14] [15]

Labor Code

Section 7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws relating to labor.

[16]

Unusual Safety Exposure

N/A

Traffic Restrictions

N/A

Project Name:    Bridge Deck Rehabilitation At Various Locations

                         Specification No. RD09-02 ;   Pr Project No.  50379

Contract Awarded to:

Contractor:

DeBruin Construction Inc.

Address

P O Box 1355,,French Camp, CA,95231

Telephone No.

(209)462-5100

License No.:

818674

Contract Information:

Contracting Agency:

County of Ventura

Awarded on Date:

6/16/2009

 

Contract Amount:

$447,654.50

Probable Starting Date:

7/14/2009

Working Days Allowed:

40

 

Probable Completion Date:

9/8/2009

Bid Advertisement Date:

5/14/09

 

Agency Contact:

Project Manager

Gerald Weeks, Jr. (Gary)

P.M. Phone No.

(805)654-3383

Project Information:

Location:

For location of project see attached list of bridge locations

Description:

Bridge Deck Rehabilitation which consists of the cleaning of the bridge decks, repairing the concrete surface, cleaning and sealing expansion joints, placing methacrylate resin, base repairs and removing and replacing asphalt concrete pavement. Purpose is Bridge Maintenance.

 


Labor Code

Section 7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws relating to labor.

Unusual Safety Exposure

N/A

Traffic Restrictions

Traffic on the roads on the attached location list may be restricted to one half of the roadway. Describe how traffic will be handled. Lane closures will be posted. Flagmen will be posted in each direction allowing vehicles to pass. There may be interruption to the normal flow of traffic.  Some roads on this project will have lane closures which result in 5-20 minutes delays.

Note: revised time to 160 work days

Project Name:    Camarillo Hills Drain - Rosewood Avenue to Lantana Street

                         Specification No. WP09-06 ;   P Project No.  85142

Contract Awarded to:

Contractor:

Sukut Construction, Inc

Address

5805 Sepulveda Blvd.,Ste 690,,Van Nuys, CA,91411

Telephone No.

(818)780-0500

License No.:

554278

Contract Information:

Contracting Agency:

Ventura County Watershed Protection District

Awarded on Date:

6/16/2009

 

Contract Amount:

$3,459,466.00

Probable Starting Date:

7/14/2009

Working Days Allowed:

160

 

Probable Completion Date:

3/11/2010

Bid Advertisement Date:

5/7/09

 

Agency Contact:

Project Manager

Masood Jilani

P.M. Phone No.

(805)654-2029

Project Information:

Location:

The project is located at Camarillo Hills Drain along the south side of Ponderosa Drive between Rosewood Avenue and Lantana Street in the City of Camarillo, Ventura County, California

Description:

This project consist of demolition, removal, and disposal of existing reinforced concrete trapezoidal channel, reinforced concrete box culvert, and Drain Reinforced Concrete junction structures, concrete Sidewalk, Curb and Gutter, Curb Ramp. Median, AC Pavement, Sanitary Sewer Pipes, Water Pipe, Trees, Chain-Link Fence, gates and other miscellaneous items.  Construction of Reinforced Concrete (RC) Rectangular Channel, RC Box Culvert, RC Junction Structures at, RC Planter Wall, RC Retaining Wall, Subdrain System, Concrete Driveway, Concrete Sidewalk, Curb and Gutter, Curb Ramp, Median, Concrete V-Ditch, AC Pavement and Overlay, Ornamental Steel Fence, Automatic Drainage Flapgate, CMB Access Road Ladders, 12-Inch Encased Ductile Iron Water Pipe, 15-Inch Concrete Encased PVC Sewer Pipe, Blowoff Assembly, Thrust Blocks Excavation Fill and Backfill, Amended Fill, Chain-Link Fence and gates, 2-Inch and 3-Inch Irrigation Pipes, Striping Installation of Traffic Control, Detour Facilities and Appurtenant Work.

 


Labor Code

Section 7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws relating to labor.

Unusual Safety Exposure

Job involves trenching to depths of 5’ to 12’ deep. An “Excavation Safety” bid item has been included to cover the above checked items. There will be work around power lines, telephone cables, etc. Specify Existing underground Edison lines, sanitary sewer line, water line, TV cable in Verizon fiber optic, and other unknown facilities.

Traffic Restrictions

Project is on or may affect traffic Roads, Streets, or Highway. Those affected are: Ponderosa Drive from Rosewood Ave to Lantana St and Rosewood Ave. Rosewood Avenue will be closed to traffic for the duration of the project. A traffic control plan has been included within the plan sheets.

 

Project Name:    North Simi Drain Channel Retrofit At Railroad Crossing

                         Specification No. WP09-08 ;   P  Project No.  87234

Contract Awarded to:

Contractor:

Bali Construction, Inc.

Address

9852 Joe Vargas Way,,South El Monte, CA,91733

Telephone No.

(626)442-8003

License No.:

524540

Contract Information:

Contracting Agency:

Ventura County Watershed Protection District

Awarded on Date:

6/16/2009

 

Contract Amount:

$738,655.00

Probable Starting Date:

7/14/2009

Working Days Allowed:

80

 

Probable Completion Date:

11/5/2009

Bid Advertisement Date:

5/14/09

 

Agency Contact:

Project Manager

Masood Jilani

P.M. Phone No.

(805)654-2029

Project Information:

Location:

The project is located 1200 feet west of First Street and about 70 feet south of Chambers Lane in the City of Simi Valley, Ventura County, California.

Description:

The project is comprised of construction of RC Pipe of which some is encased in steel casing and some of which will be jacked under the railroad track, reinforced concrete (RC) junction structure, storm drain manhole, RC box wall repair, new sewer manholes, sewer pipe, surface drain pipes, concrete apron, CMB access road, temporary access bridge, chain link  fence and gate and appurtenant work. Removal and disposal of sewer line, sewer manhole, RC Pipe, buried bridge wingwall abutments and interfering foundation, surface drain pipes, CMB access road, chain link fence and gate.

 


Labor Code

Section 7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws relating to labor.

Unusual Safety Exposure

Job involves trenching to depths of 5’ to 12’ deep.  An “Excavation Safety” bid item has been included to cover the above checked items. There will be work around power lines, gas lines, telephone cables, etc. Existing Level 3, AT&T, Sprint, and MCI fiber optic lines; railroad and other unknown communication line; and sewer line.

Traffic Restrictions

Project is o or may affect Roads, Streets or Highways. Those affected are: Chambers Lane and Easy Street. A temporary access bridge is required for the property owners south of Chambers Lane. Section 1005-2. Traffic on Chambers lanes may be restricted to one half of the roadway. Describe how traffic will be handled. Single lane closure.

Project Name:    Pavement Rehabilitation - 2008 High Priority On-System Roads

                         Specification No. RD09-06           Project No.  50435

Contract Awarded to:

Contractor:

Toro Enterprises, Inc.

Address

P. O. Box 6285,,Oxnard, CA,93031

Telephone No.

(805)483-4515

License No.:

710580

Contract Information:

Contracting Agency:

County of Ventura

Awarded on Date:

6/12/2009

 

Contract Amount:

$1371489.40

Probable Starting Date:

7/10/2009

Working Days Allowed:

60

 

Probable Completion Date:

10/5/2009