Project
Name: El Rio Forebay
Groundwater Contaminant Elimination Project (GCEP)El Rio Sewer System Phases
5B, 5C, and 5D
|
|
Specification No. WW09-05 ;
|
9
|
Project No. 28236
|
Contract
Awarded to:
|
Contractor:
|
Specialty
Construction, Inc.
|
2
|
|
Address
|
645 Clarion Ct.,,San Luis Obispo,
CA,93401
|
4
|
5
|
6
|
|
Telephone No.
|
(805)543-1706
|
7
|
License No.:
|
619361
|
3
|
|
|
|
|
|
|
|
|
Contract
Information:
|
Contracting Agency:
|
County of Ventura
|
|
Awarded on Date:
|
10/20/2009
|
Contract
Amount:
|
$7,076,403.00
|
10
|
|
Probable Starting Date:
|
11/17/2009
|
11
|
Working Days
Allowed:
|
400
|
|
Probable Completion Date:
|
7/8/2011
|
12
|
Bid Advertisement Date:
|
7/2/09
|
Agency Contact:
|
Project Manager
|
Cefe Munoz
|
P.M. Phone
No.
|
(805)378-3020
|
Project
Information:
|
Location:
|
North of US 101 between Vineyard Ave. and Rose
Ave., including Alvarado St., Citrus St., Collins St., Corsicana Dr.,
Cortez St., Helsam Ave., Kenney St., Minna St., Orange Dr., Rio School
Lane, Rose Ave., Salem Av., Stroube St., Vineyard Av., and Walnut Dr. , in
El Rio, near Oxnard, Ca.
|
8
|
|
Description:
|
Installation
of gravity sewer collection system and appurtenant work.
|
13
|
|
14
|
|
15
|
|
Labor
Code
|
Section 7-2.2 of Ventura County Standard
Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws
relating to labor.
|
16
|
|
|
|
Unusual
Safety Exposure
|
Job involves trenching, depths 5-16 ft deep. Job has unstable soil conditions, a
Geotechnical Report prepared by Earth systems, Dated March 25, 2003 was
provided. An “Excavation Safety” bid
item has been included. There will
be work around Storm drains, gas power lines and telephone cables, water
and oil lines.
|
|
Traffic Restrictions
|
Project is on or may
effect the following streets: Balboa to George Street including: Lemar
Avenue, Will Avenue, Simon Way, Salem Avenue, Helsam Avenue and all of
George Street.
Traffic signs shall be installed, traffic flow
shall be maintained, and lanes may be closed per Traffic Control Plans
requirements and Encroachment Permit. There may be interruptions to the
normal flow of traffic: Contractor
shall submit work area plan and/or Traffic control Plan as required by
Transportation Dept..
|
|
|
Project
Name: Pavement
Rehabilitation 2008 On - System Roads
|
|
Specification
No. RD09-03 ;
|
9
|
Project No.
50434
|
Contract
Awarded to:
|
Contractor:
|
Toro Enterprises, Inc.
|
2
|
|
Address
|
P O Box 6285,,Oxnard, CA,93031
|
4
|
5
|
6
|
|
Telephone No.
|
(805)483-4515
|
7
|
License No.:
|
710580
|
3
|
|
|
|
|
|
|
|
|
Contract Information:
|
Contracting Agency:
|
County of Ventura
|
|
Awarded on Date:
|
10/1/2009
|
Contract Amount:
|
$1,346,900.50
|
10
|
|
Probable Starting
Date:
|
10/15/2009
|
11
|
Working Days Allowed:
|
42
|
|
Probable
Completion Date:
|
1/12/1900
|
12
|
Bid Advertisement Date:
|
9/3/09
|
Agency Contact:
|
Project Manager
|
Ariel Braza
|
P.M. Phone No.
|
(805)654-2058
|
Project
Information:
|
Location:
|
Location of Project Santa
Rosa Rd., Camino Dos Rios, Foothill Rd., Villanova Rd. and Doris Ave (See
attached page 2 for location list)
|
8
|
|
Description:
|
Pavement Rehabilitation
including roadway preparation, crack sealing, AC base repair, concrete curb
and gutter, cold milling and grinding conventional AC overly, traffic
control, construction signing, traffic counter station installation,
traffic signal loop detector, pavement delineation and striping.
|
13
|
|
14
|
|
15
|
|
Labor Code
|
Section 7-2.2 of Ventura
County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws
relating to labor.
|
16
|
|
|
|
Unusual Safety Exposure
|
N/A
|
|
Traffic
Restrictions
|
Affect Roads: Santa Rosa Road,
Camino Dos Rios, Foothill Road,
Villanova Road
and Doris Road.
Traffic on the above roads may be restricted to one half of the roadway.
Describe how traffic will be handled. Lane closures are allowed between
8:30 a.m. to 4:00 p.m. Contractor shall place flagmen in each direction
directing traffic. On Santa
Rosa Road, no lane closures allowed between
6:00 a.m. – 9:00 a.m. and 3:30 p.m. – 5:30 p.m. Contractor shall place a
Changeable message sign (CMS) on Santa
Rosa Road on the approach to the work in each
direction at least days before traffic disruptions begin. Two CMS shall remain
until paving is complete. Interruptions may occur due to one lane closure
as stated above.
|
|
|
NAME OF ROAD
|
LIMITS
|
THOMAS GUIDE NO.
|
|
Santa
Rosa Road
|
Yucca Drive to Glenside Lane (Near city of Camarillo)
|
495-J7,496-A7, 496-B7
|
|
Camino Dos Rios
|
Cul De Sac to 67' W/O Lynn Road (Near the City of Thousand Oaks
|
526-B6, 526-C6, 526-D6
|
|
Foothill Road
|
Aliso
Canyon Road to Wheelr Canyon Road
(Near the city of Ventura
|
473-B1, 473-B2, 473-B3, 473-B4
|
|
Villanova
Road
|
SR 33 to 203 E/O County Drive and 203 E/O County Drive
to SR 33 (Near the city of Ojai)
|
451-C3, 451-D3, 451-D2, 451-E2, 451-F2
|
|
Doris
Avenue
|
Victoria
Avenue to 77' W/O Patterson
Road (Near the city of Oxnard)
|
522-B5, 522-C5, 522-D5
|
|
|
|
|
|
|
Project
Name: Sespe Creek Toe
Repair 2009
|
|
Specification
No. WP10-12 ;
|
9
|
Project No.
83310
|
Contract
Awarded to:
|
Contractor:
|
Belaire-West Landscape, Inc.
|
2
|
|
Address
|
P.O. Box 6270,,Buena Park, CA,90620
|
4
|
5
|
6
|
|
Telephone No.
|
(714)523-9200
|
7
|
License No.:
|
448636
|
3
|
|
|
|
|
|
|
|
|
Contract Information:
|
Contracting Agency:
|
Ventura County Watershed Protection District
|
|
Awarded on Date:
|
9/17/2009
|
Contract Amount:
|
$158,196.00
|
10
|
|
Probable Starting
Date:
|
10/1/2009
|
11
|
Working Days Allowed:
|
30
|
|
Probable
Completion Date:
|
11/13/2009
|
12
|
Bid Advertisement Date:
|
8/20/09
|
Agency Contact:
|
Project Manager
|
Kirk Norman
|
P.M. Phone No.
|
(805)654-2017
|
Project
Information:
|
Location:
|
Levee is on the east side of Sespe Creek, between Old Telegraph Road
and Goodenough Road,
Fillmore
|
8
|
|
Description:
|
Construction of 1,900 linear feet of curb, gutter,
v-ditch, and 2680 square yards of CMB access road, and appurtenant work.
Purpose of project is part of the FEMA Levee certification program.
|
13
|
|
14
|
|
15
|
|
Labor Code
|
Section 7-2.2 of Ventura County Standard Specifications
provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws
relating to labor.
|
16
|
|
|
|
Unusual Safety
Exposure
|
Job has unstable soil conditions, Cuts into levee toe.
An “Excavation Safety” bid item has been included, Excavation will be less
than 5’ deep. There will be work around Power lines.
|
|
Traffic
Restrictions
|
Project work will not affect traffic on any public way.
|
|
|
Project
Name: Sespe Creek
Levee At Goodenough Rd 2009
|
|
Specification
No. WP10-13(I) ;
|
9
|
Project No.
12007
|
Contract
Awarded to:
|
Contractor:
|
Cal Fran Engineering, Inc.
|
2
|
|
Address
|
990 Enchanted Way, Ste 106,,Simi Valley, CA,93065
|
4
|
5
|
6
|
|
Telephone No.
|
(805)579-9173
|
7
|
License No.:
|
701492
|
3
|
|
|
|
|
|
|
|
|
Contract
Information:
|
Contracting Agency:
|
Ventura County Watershed Protection District
|
|
Awarded on Date:
|
9/16/2009
|
Contract Amount:
|
$52,951.00
|
10
|
|
Probable Starting
Date:
|
10/7/2009
|
11
|
Working Days Allowed:
|
15
|
|
Probable
Completion Date:
|
10/28/2009
|
12
|
Bid Advertisement Date:
|
9/3/09
|
Agency Contact:
|
Project Manager
|
Larry Tanouye
|
P.M. Phone No.
|
(805)672-2105
|
Project
Information:
|
Location:
|
Project is located approximately less than a mile west
of Goodenough Rd.
and less than a mile northwest of the intersection of Goodenough Rd. and Griffan Dr., City of Fillmore
|
8
|
|
Description:
|
Removal of all irrigation features, vegetation, trees,
root balls, the filling of resulting voids with impervious material while
firmly compacting and reshaping the toe to the 2:1 slope requirement.
Purpose of project is to restore the toe to its original design intent thus
guaranteeing compliance with current levee requirements. Its also provides
erosion control and other necessary maintenance that will prevent future flood
control issues.
|
13
|
|
14
|
|
15
|
|
Labor Code
|
Section 7-2.2 of Ventura County Standard Specifications
provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws
relating to labor.
|
16
|
|
|
|
Unusual Safety
Exposure
|
There will be work around power lines.
|
|
Traffic
Restrictions
|
Project work will not affect traffic on any public way.
|
|
|
Project
Name: River Parkways
Grant Giant Reed Removal 2009
|
|
Specification No. WP10-01 ;
|
9
|
Project No. 81908
|
Contract
Awarded to:
|
Contractor:
|
Natures
Image, Inc.
|
2
|
|
Address
|
20472 Crescent Bay Drive, Suite 102,,Lake Forest, CA,92630
|
4
|
5
|
6
|
|
Telephone No.
|
(949)705-5800
|
7
|
License No.:
|
720513
|
3
|
|
|
|
|
|
|
|
|
Contract
Information:
|
Contracting Agency:
|
Ventura County Watershed Protection District
|
|
Awarded on Date:
|
9/15/2009
|
Contract
Amount:
|
$307,359.00
|
10
|
|
Probable Starting Date:
|
9/29/2009
|
11
|
Working Days
Allowed:
|
545
Calendar
|
|
Probable Completion Date:
|
4/1/11
|
12
|
Bid Advertisement Date:
|
8/13/09
|
Agency Contact:
|
Project Manager
|
Karl Novak
|
P.M. Phone
No.
|
(805)654-3706
|
Project
Information:
|
Location:
|
Project
is near Highway 150 along the Ventura
River, in an
unincorporated area of Ojai. Nearest cross streets are Highway 150 and S. Rice Road.
|
8
|
|
Description:
|
Remove
and retreat giant reed (arundo donax) and other non-native vegetation
within an approximate 175 acre site along the Ventura River.
Purpose of project is to remove non-native (exotic) plants thus restoring
the native ecosystem along the river in the interest of fire and flood
prevention, utilizing California River Parkways Giant Programs funds.
|
13
|
|
14
|
|
15
|
|
Labor Code
|
Section
7-2.2 of Ventura County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws
relating to labor.
|
16
|
|
|
|
Unusual Safety Exposure
|
N/A
|
|
Traffic Restrictions
|
N/A
|
|
|
Project
Name: Well No. 20 and
Treatment Works
|
|
Specification
No. WW09-01 ;
|
9
|
Project No.
31831
|
Contract
Awarded to:
|
Contractor:
|
V. Lopez Jr. & Sons
|
2
|
|
Address
|
General Eng. Contractors, Inc.,P O Box 488,Santa Maria, CA,93456
|
4
|
5
|
6
|
|
Telephone No.
|
(805)928-1198
|
7
|
License No.:
|
607333
|
3
|
|
|
|
|
|
|
|
|
Contract
Information:
|
Contracting Agency:
|
Ventura County Waterworks District No. 1
|
|
Awarded on Date:
|
8/11/2009
|
Contract Amount:
|
$1,814,555.00
|
10
|
|
Probable Starting
Date:
|
September 8, 2009
|
11
|
Working Days Allowed:
|
200
|
|
Probable
Completion Date:
|
July 6, 2010
|
12
|
Bid Advertisement Date:
|
6/4/09
|
Agency Contact:
|
Project Manager
|
Eric Keller
|
P.M. Phone No.
|
(805)378-3025
|
Project
Information:
|
Location:
|
Championship Drive, ½ mile east of Grimes Canyon Road, in the city of Moorpark
|
8
|
|
Description:
|
Construction of well pump,
automatic water filtration system, booster pumps, 32,000 gal reclaim tank
& pump, CMU chemical and controls building, roll-away type steel frame
well pump-house, electrical switchgear, instrumentation, yard piping, and
grading. Project will provide local water form existing Well No.20 at 1000
gpm through an existing pipeline to the Palmer Reservoir 944 pressure zone.
|
13
|
|
14
|
|
15
|
|
Labor Code
|
Section 7-2.2 of Ventura County Standard Specifications
provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws
relating to labor.
|
16
|
|
|
|
Unusual Safety
Exposure
|
Job involves trenching to 8 feet deep. An “Excavation Safety” bid item has been
included to cover the above checked items. Job will probably require
scaffolding above the ground floor. There will be work around power lines,
telephone cables and Water lines.
|
|
Traffic
Restrictions
|
Project work will not affect traffic on any public way.
|
|
|
Project
Name: Ventura County
Waterworks District No. 1 Roseland Booster Pump Station
|
|
Specification
No. WW09-06 ;
|
9
|
Project No.
31886
|
Contract
Awarded to:
|
Contractor:
|
Blois Construction, Inc.
|
2
|
|
Address
|
3201 Sturgis Rd.,,Oxnard, CA,93030
|
4
|
5
|
6
|
|
Telephone No.
|
(805)656-1432
|
7
|
License No.:
|
256065
|
3
|
|
|
|
|
|
|
|
|
Contract
Information:
|
Contracting Agency:
|
Ventura County Waterworks District No. 1
|
|
Awarded on Date:
|
8/5/2009
|
Contract Amount:
|
$562,242.00
|
10
|
|
Probable Starting
Date:
|
September 2, 2009
|
11
|
Working Days Allowed:
|
125
|
|
Probable
Completion Date:
|
March 12, 2010
|
12
|
Bid Advertisement Date:
|
4/30/09
|
Agency Contact:
|
Project Manager
|
Eric Keller
|
P.M. Phone No.
|
(805)378-3025
|
Project
Information:
|
Location:
|
Fairview Reservoir, 8875 Roseland Avenue, Moorpark
93021
|
8
|
|
Description:
|
Construction of a booster
pump station at existing reservoir site, consisting of site work, pumps,
piping, electrical, and instrumentation work including a stand by
generator. Construction of booster
pump station to serve customers located at higher elevations with water
pressure for domestic and firefighting purposes.
|
13
|
|
14
|
|
15
|
|
Labor Code
|
Section 7-2.2 of Ventura County Standard Specifications
provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws
relating to labor.
|
16
|
|
|
|
Unusual Safety
Exposure
|
Job involves trenching
over 5’ deep. Give range of trench depths: 3 to 9-ft. An “Excavation Safety”
bid item has been included. There will be work around Water and Power lines
and telephone cables.
|
|
Traffic
Restrictions
|
Project is on or may
affect Roads, Streets and Highways. Those affected are: Roseland Avenue may be impacted for
1-week maximum during final pipeline connection & valves. Traffic on Roseland Ave.
may be restricted to one half of the roadway. Contractor will provide flagmen to
facilitate traffic in both directions.
|
|
|
Project
Name: Pavement
Rehabilitation-2009 On System Roads Phase A - Various Locations
|
|
Specification
No. RD09-10 ;
|
9
|
Project No.
50451
|
Contract
Awarded to:
|
Contractor:
|
Granite Construction Company
|
2
|
|
Address
|
P.O. Box 50085,,Watsonville, CA,95077
|
4
|
5
|
6
|
|
Telephone No.
|
(831)724-1011
|
7
|
License No.:
|
89
|
3
|
|
|
|
|
|
|
|
|
Contract
Information:
|
Contracting Agency:
|
County of Ventura
|
|
Awarded on Date:
|
7/10/2009
|
Contract Amount:
|
$2,131,545.00
|
10
|
|
Probable Starting
Date:
|
August 7, 2009
|
11
|
Working Days Allowed:
|
50
|
|
Probable
Completion Date:
|
October 20, 2009
|
12
|
Bid Advertisement Date:
|
5/28/09
|
Agency Contact:
|
Project Manager
|
Ariel Braza
|
P.M. Phone No.
|
(805)654-2058
|
Project
Information:
|
Location:
|
Location of project is on Mission Drive, Beardsley Road, Corsicana Drive, Simon Way, West Potrero Road, Center School Road,
Tico Road,
Spring Road. Near the city of Oxnard, Camarillo, Thousand
Oaks, and Ojai, see page 2 attached for more
complete description.
|
8
|
|
Description:
|
Pavement rehabilitation
including roadway preparation, surface preparation and crack sealing,
asphalt rubber hot mix and conventional AC overlay, and shoulder
backing. It also includes traffic
control and construction signing, traffic counter station installation,
traffic signal loop detector replacement and pavement delineation and
striping.
|
13
|
|
14
|
|
15
|
|
Labor Code
|
Section 7-2.2 of Ventura County Standard Specifications
provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws
relating to labor.
|
16
|
|
|
|
Unusual Safety
Exposure
|
N/A
|
|
Traffic
Restrictions
|
Traffic on roads in the
location list may be restricted to one half of the roadway. One lane will be opened at all times with
flagmen posted in each direction directing traffic.
|
Page 2 of 2
Project Name: Pavement Rehabilitation – 2009 ON SYSTEM
ROADS
Phase A – Various Locations
Specification No.: RD09-10 Project No.: 50451
Federal Project No.: ESPL-5952
(139)
Locations:
- Thomas Guide No.
and Supervisorial District:
Supervisor District No. 3:
1) Mission Dr – 494D6, 494D7
Limits: Mission Dr 140s Catalina Dr – N Loop Dr
(Chatsworth Peak; near City of Camarillo)
2) Beardsley
Rd – 493G7, 523F1
Limits: Beardsley Rd - Central Av – 413n Wright Rd
(Del Norte Area; near City
of Camarillo)
3) West Potrero Rd – 554C4, 554D4, 554E4, 554F4, 554G4,
554H4, 554J4, 555A4
Limits: West Potrero Rd - Hueneme Rd
– 1.8mi east
1.8mi e Hueneme Rd
– MP 3.5
MP 3.5 – 727w Via Acosta
(Hidden Valley; near City of Thousand
Oaks)
4) Center
School Rd – 494C4, 494C5
Limits: Center School Rd - 436e Callado St – SR 118
(Las Posas
Valley; near City of Camarillo
Supervisor District No. 5:
5) Corsicana
Dr
– 492J7, 523A1
Limits: Corsicana Dr - CDS – Rose Av
(El Rio; near City of Oxnard)
6) Simon
Way – 492J7, 493A7
Limits: Simon Way - Vineyard Av SR232 – Rose Av
(El Rio; near City of Oxnard)
Supervisor District No. 1:
7) Tico
Rd
– 441D7, 451D1,
451D2
Limits: Tico Road
- SR 150 – Lomita Av
(Mira Monte; near City of Ojai)
8) Spring Road – 451B7, 461B1
Limits: Spring Road - 840s Grande V – Grande Vista St. Grande Vista St
– Larmier Av
(Oak View; near City of
Ojai)
|
|
Project
Name: Tapo Canyon L.A Ave to Cochran
St Repair 2009
Specification
No. WP09-16(M) [9];Project No. 47422
Contract
Awarded to:
|
Contractor:
|
Aguilera Bros.
Construction, Inc.
|
[2]
|
|
Address
|
288 Country View Ct.,,Santa Paula, CA,93060
|
[4-6]
|
|
Telephone No.
|
(805)933-3067
|
[7]
|
License No.:
|
873775
|
[3]
|
|
|
|
|
|
|
Contract Information:
|
Contracting Agency:
|
Ventura County Watershed
Protection District
|
|
Awarded on Date:
|
6/23/2009
|
|
Contract Amount:
|
$633901.00
|
[10
|
|
Probable Starting
Date:
|
TBD, Permit Issue
|
[11]
|
Working Days Allowed:
|
30 (REVISED)
|
|
|
Probable
Completion Date:
|
TBD
|
[12]
|
Bid Advertisement Date:
|
6/23/09
|
|
Agency Contact:
|
Project Manager
|
Karl Novak
|
P.M. Phone No.
|
(805)672-2106
|
Project Information:
|
Location:
|
The project is located on the Northeast and Southwest
bank of Tapo Canyon Channel from Los
Angeles Avenue to Cochran Street in the City of Simi Valley. Access
to the project is from Cochran
St., Copley
St., and Los Angeles Ave.
|
[8]
|
|
Description:
|
The project consists of repairing damage at 34 sites
along a 3400’ reach of the trapezoidal channel. Repairs include replacing 3325’ of
concrete invert, excavating and replacing sections of both the east and
west banks, and epoxy crack repair. Project purpose is to repair the invert
and east and west banks of an existing trapezoidal RC channel that has been
in service for over 45 years and has been damaged by winter storms.
|
[13]
[14] [15]
|
|
Labor Code
|
Section 7-2.2 of Ventura County Standard Specifications
provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws
relating to labor.
|
[16]
|
|
Unusual Safety Exposure
|
N/A
|
|
Traffic Restrictions
|
N/A
|
|
|
Project
Name: Arundell
Barranca Telegraph Rd. to Loma Vista Rd. Channel Repair 2009
Specification
No. WP09-10(M) [9];Project No. 42405
Contract
Awarded to:
|
Contractor:
|
Coastal Grading & Excavating, Inc.
|
[2]
|
|
Address
|
P O Box 2459,,Moorpark, CA,93021
|
[4-6]
|
|
Telephone No.
|
(805)523-7995
|
[7]
|
License No.:
|
853340
|
[3]
|
|
|
|
|
|
|
Contract Information:
|
Contracting Agency:
|
Ventura County Watershed Protection District
|
|
Awarded on Date:
|
6/23/2009
|
|
Contract Amount:
|
$183507.00
|
[10
|
|
Probable Starting
Date:
|
TBD, Permit Issue
|
[11]
|
Working Days Allowed:
|
30
|
|
|
Probable Completion
Date:
|
TBD
|
[12]
|
Bid Advertisement Date:
|
6/23/09
|
|
Agency Contact:
|
Project Manager
|
Karl Novak
|
P.M. Phone No.
|
(805)672-2106
|
Project Information:
|
Location:
|
This project is located in
the City of Ventura within the County of Ventura. The job site is situated
0.75 miles NNW of Hwy 126 and Victoria and
500’ west of Wake
Forest and Loma
Vista. Access to the area is from the southern side of Loma Vista where it
crosses the Arundell Barranca.
|
[8]
|
|
Description:
|
The project consists of
repair of damaged sections of existing slope protection, backfilling eroded
channel bank sections, and repairing damaged concrete invert and stabilizer
locations. Project purpose is erosion control measures to restore the
barranca to its original design intent, providing much needed maintenance
and prevention of future flood control issues.
|
[13]
[14] [15]
|
|
Labor Code
|
Section 7-2.2 of Ventura County Standard Specifications
provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws
relating to labor.
|
[16]
|
|
Unusual Safety Exposure
|
N/A
|
|
Traffic Restrictions
|
N/A
|
|
|
Project
Name: Bridge Deck
Rehabilitation At Various Locations
Specification
No. RD09-02 ; Pr
Project No. 50379
Contract
Awarded to:
|
Contractor:
|
DeBruin Construction Inc.
|

|
|
Address
|
P O Box 1355,,French Camp, CA,95231
|
  
|
|
Telephone No.
|
(209)462-5100
|

|
License No.:
|
818674
|

|
|
|
|
|
|
|
Contract Information:
|
Contracting Agency:
|
County of Ventura
|
|
Awarded on Date:
|
6/16/2009
|
|
Contract Amount:
|
$447,654.50
|

|
|
Probable Starting
Date:
|
7/14/2009
|

|
Working Days Allowed:
|
40
|
|
|
Probable
Completion Date:
|
9/8/2009
|

|
Bid Advertisement Date:
|
5/14/09
|
|
Agency Contact:
|
Project Manager
|
Gerald Weeks, Jr. (Gary)
|
P.M. Phone No.
|
(805)654-3383
|
Project Information:
|
Location:
|
For location of project
see attached list of bridge locations
|

|
|
Description:
|
Bridge Deck Rehabilitation
which consists of the cleaning of the bridge decks, repairing the concrete
surface, cleaning and sealing expansion joints, placing methacrylate resin,
base repairs and removing and replacing asphalt concrete pavement. Purpose
is Bridge Maintenance.
|
 

|
|
Labor Code
|
Section 7-2.2 of Ventura
County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws
relating to labor.
|

|
|
Unusual Safety
Exposure
|
N/A
|
|
Traffic
Restrictions
|
Traffic on the roads on
the attached location list may be restricted to one half of the roadway.
Describe how traffic will be handled. Lane closures will be posted. Flagmen
will be posted in each direction allowing vehicles to pass. There
may be interruption to the normal flow of traffic. Some roads on this project will have lane
closures which result in 5-20 minutes delays.
|

|
|
Note:
revised time to 160 work days
Project
Name: Camarillo Hills
Drain - Rosewood Avenue to Lantana Street
Specification
No. WP09-06 ; P
Project No. 85142
Contract
Awarded to:
|
Contractor:
|
Sukut Construction,
Inc
|

|
|
Address
|
5805 Sepulveda
Blvd.,Ste 690,,Van Nuys, CA,91411
|
  
|
|
Telephone No.
|
(818)780-0500
|

|
License
No.:
|
554278
|

|
|
|
|
|
|
|
Contract Information:
|
Contracting Agency:
|
Ventura County
Watershed Protection District
|
|
Awarded on Date:
|
6/16/2009
|
|
Contract
Amount:
|
$3,459,466.00
|

|
|
Probable Starting Date:
|
7/14/2009
|

|
Working
Days Allowed:
|
160
|
|
|
Probable Completion Date:
|
3/11/2010
|

|
Bid Advertisement Date:
|
5/7/09
|
|
Agency Contact:
|
Project Manager
|
Masood Jilani
|
P.M.
Phone No.
|
(805)654-2029
|
Project Information:
|
Location:
|
The project is located at
Camarillo Hills Drain along the south side of Ponderosa Drive between Rosewood Avenue
and Lantana Street
in the City of Camarillo, Ventura County, California
|

|
|
Description:
|
This project consist of
demolition, removal, and disposal of existing reinforced concrete
trapezoidal channel, reinforced concrete box culvert, and Drain Reinforced
Concrete junction structures, concrete Sidewalk, Curb and Gutter, Curb
Ramp. Median, AC Pavement, Sanitary Sewer Pipes, Water Pipe, Trees,
Chain-Link Fence, gates and other miscellaneous items. Construction of Reinforced Concrete (RC)
Rectangular Channel, RC Box Culvert, RC Junction Structures at, RC Planter
Wall, RC Retaining Wall, Subdrain System, Concrete Driveway, Concrete
Sidewalk, Curb and Gutter, Curb Ramp, Median, Concrete V-Ditch, AC Pavement
and Overlay, Ornamental Steel Fence, Automatic Drainage Flapgate, CMB
Access Road Ladders, 12-Inch Encased Ductile Iron Water Pipe, 15-Inch
Concrete Encased PVC Sewer Pipe, Blowoff Assembly, Thrust Blocks Excavation
Fill and Backfill, Amended Fill, Chain-Link Fence and gates, 2-Inch and
3-Inch Irrigation Pipes, Striping Installation of Traffic Control, Detour
Facilities and Appurtenant Work.
|
 

|
|
Labor Code
|
Section 7-2.2 of Ventura
County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws
relating to labor.
|

|
|
Unusual Safety Exposure
|
Job involves trenching to
depths of 5’ to 12’ deep. An “Excavation Safety” bid item has been included
to cover the above checked items. There will be work around power lines,
telephone cables, etc. Specify Existing underground Edison
lines, sanitary sewer line, water line, TV cable in Verizon fiber optic,
and other unknown facilities.
|
|
Traffic Restrictions
|
Project is on or may
affect traffic Roads, Streets, or Highway. Those affected are: Ponderosa Drive
from Rosewood Ave
to Lantana St and Rosewood Ave. Rosewood Avenue will be closed to traffic
for the duration of the project. A traffic control plan has been included
within the plan sheets.
|

|
|
Project
Name: North Simi Drain
Channel Retrofit At Railroad Crossing
Specification
No. WP09-08 ;
P Project No. 87234
Contract
Awarded to:
|
Contractor:
|
Bali Construction, Inc.
|

|
|
Address
|
9852 Joe Vargas Way,,South El Monte, CA,91733
|
  
|
|
Telephone No.
|
(626)442-8003
|

|
License No.:
|
524540
|

|
|
|
|
|
|
|
Contract Information:
|
Contracting Agency:
|
Ventura County Watershed Protection District
|
|
Awarded on Date:
|
6/16/2009
|
|
Contract Amount:
|
$738,655.00
|

|
|
Probable Starting
Date:
|
7/14/2009
|

|
Working Days Allowed:
|
80
|
|
|
Probable
Completion Date:
|
11/5/2009
|

|
Bid Advertisement Date:
|
5/14/09
|
|
Agency Contact:
|
Project Manager
|
Masood Jilani
|
P.M. Phone No.
|
(805)654-2029
|
Project Information:
|
Location:
|
The project is located
1200 feet west of First Street
and about 70 feet south of Chambers
Lane in the City of Simi
Valley, Ventura County,
California.
|

|
|
Description:
|
The project is comprised
of construction of RC Pipe of which some is encased in steel casing and
some of which will be jacked under the railroad track, reinforced concrete
(RC) junction structure, storm drain manhole, RC box wall repair, new sewer
manholes, sewer pipe, surface drain pipes, concrete apron, CMB access road,
temporary access bridge, chain link
fence and gate and appurtenant work. Removal and disposal of sewer
line, sewer manhole, RC Pipe, buried bridge wingwall abutments and
interfering foundation, surface drain pipes, CMB access road, chain link
fence and gate.
|
 

|
|
Labor Code
|
Section 7-2.2 of Ventura
County Standard Specifications provide for compliance with
Labor Code Sections 1776 and 1777.5 and all other state and federal laws
relating to labor.
|

|
|
Unusual Safety
Exposure
|
Job involves trenching to
depths of 5’ to 12’ deep. An
“Excavation Safety” bid item has been included to cover the above checked
items. There will be work around power lines, gas lines, telephone cables,
etc. Existing Level 3, AT&T, Sprint, and MCI fiber optic lines;
railroad and other unknown communication line; and sewer line.
|
|
Traffic
Restrictions
|
Project is o or may affect
Roads, Streets or Highways. Those affected are: Chambers Lane and Easy Street. A
temporary access bridge is required for the property owners south of Chambers Lane.
Section 1005-2. Traffic on Chambers lanes may be restricted to one half of
the roadway. Describe how traffic will be handled. Single lane closure.
|
 
|
|
Project
Name: Pavement Rehabilitation - 2008 High Priority On-System Roads
Specification
No. RD09-06 Project No. 50435
Contract
Awarded to:
|
Contractor:
|
Toro Enterprises, Inc.
|

|
|
Address
|
P. O. Box 6285,,Oxnard, CA,93031
|
  
|
|
Telephone No.
|
(805)483-4515
|

|
License No.:
|
710580
|

|
|
|
|
|
|
|
Contract Information:
|
Contracting Agency:
|
County of Ventura
|
|
Awarded on Date:
|
6/12/2009
|
|
Contract Amount:
|
$1371489.40
|

|
|
Probable Starting
Date:
|
7/10/2009
|

|
Working Days Allowed:
|
60
|
|
|
Probable
Completion Date:
|
10/5/2009
|
![]()
| |